Bid No. 2021-2062Z

Landscape & Nursery Technology Project – Increments 1 & 2

Status

Bidding Closed

Prebid Date4/7/21 10:00am

Bid Date4/20/21 2:00pm

Company & Contacts

Southwestern College

Vani Aulicino   vaulicino@balfourbeattyus.com

Location

900 Otay Lakes Rd, Chula Vista, CA 91910

NOTICE IS HEREBY GIVEN that Southwestern Community College District of San Diego County, California, acting by and through its Governing Board, hereinafter referred to as the “DISTRICT” will receive up to, but no later than 2:00 P.M. on April 15, 2021 electronic only submittals for Bid No. 2021-2062Z. Bids shall be submitted electronically through the SWC Bond Plan Room (www.swcbondplanroom.com), and shall be opened on the date and at the time listed above for the award of a contract for the Landscape & Nursery Technology Project – Increments 1 & 2 for the following bid packages:

BP L-1 Site Setup*
BP L-2 Survey
BP L-3 Demolition and Earthwork*
BP L-4 Concrete*
BP L-5 Underground Wet Utilities and Plumbing*
BP L-6 Underground Dry Utilities and Electrical*
BP L-7 Masonry*
BP L-8 Steel*
BP L-9 Flashing and Sheetmetal*
BP L-10 Roofing*
BP L-11 General Trades*
BP L-12 Casework*
BP L-13 Glazing*
BP L-14 Flooring
BP L-15 Tiling
BP L-16 Fire Protection*
BP L-17 HVAC*
BP L-18 Landscape & Irrigation*
BP L-19 Asphalt and Striping*
BP L-21 Rough Carpentry*
BP L-23 Greenhouses*

*Note: Only bidders who have met the Southwestern College Prequalification requirements are eligible to submit bids. Visit https://www.swccd.edu/swc-community/propositions-r-and-z/bidand-plan.aspx for a list of prequalified contractors.

Each bidder shall be a licensed contractor pursuant to the California Business and Professions Code Section 7028.15 and Public Contract Code Section 3300, and shall be licensed in the following classification as required by the scope of work required in the above called out bid packages:

BP License
BP L-1 Site Setup* C-13
BP L-2 Survey Prof. License Surveyor
BP L-3 Demolition and Earthwork* A, or C12 and C21
BP L-4 Site Concrete and Asphalt* C-8 and C-12
BP L-5 Wet Utilities* A and or C36
BP L-6 Dry Utilities* C-10
BP L-7 Masonry* C-29
BP W-L Steel* C-51, C-13, C-51
BP W-L Flashing and Sheet Metal* C-43, C-39
BP L-10 Roofing* C-46, C-39, C-43
BP L-11 General Trades* B or All of the following inclusive C-2, C-6, C5, C-9, C-11, C-28, C-33, C-35, C-45, B or D64
BP L-12 Casework* C-6
BP L-13 Glazing* C-17, D-52
BP L-14 Flooring B or all of the following inclusive C-15, C-54
BP L-15 Tiling C-54
BP L-16 Fire Protection* C-16
BP L-17 HVAC* A and C20, C-34, C-36, C-7, C-4, C-10, C-34, C-36, Prof License Surveyor
BP L-18 Landscape and Irrigation* C-31, C-42, C-27
BP L-19 Asphalt and Striping* C-7, C-4, C-10, C-20, C-28
BP L-21 Rough Carpentry* C-5
BP L-23 Greenhouses* B or C-61

NEW MANDATORY Pre-Bid Conference to be held at Southwestern Community College, Building 98A located at 900 Otay Lakes Road, Chula Vista, CA 91910 on the following date and time: April 7, 2021 at 10:00 A.M. Bidders who did not attend the previous February 24, 2021 Pre-Bid Conference must attend to qualify to submit a bid. COVID-19 safety protocols will be enforced (masks, gloves, and maintain social distancing) at the Pre-Bid Conference are required to attend the Pre-Bid Conferences.

Prospective bidders MAY NOT re-visit the Project Site without making arrangements through the Construction Manager (Balfour Beatty – Vani Aulicino, Preconstruction Manager). The District WILL NOT accept bids from any bidder who did not attend the Pre-Bid Conference. Pursuant to Public Contract Code Section 3400©, if the District has made any findings designating certain materials, products, things, or services by specific brand or trade name, such findings and the materials, products, things, or services and their specific brand or trade names will be set forth in the Special Conditions.

All questions concerning this bid should be sent to Vani Aulicino at vaulicino@balfourbeattyus.com. All questions to be submitted on Exhibit 4.D.1 – Pre Bid RFI Form / Instructions. The final day for questions shall be March 26, 2021 no later than 4 p.m.

Bid documents will be available week of:February 1, 2021.

Dated this: February 4, 2021.